This project focuses on the work of the Strait crossing, with a single-span suspension bridge for a total lenght of 3,300mt, with two side spans of a 180 mt equal length in addition.
The bridge is composed of six traffic lanes in each direction (4 motorway, two service and rescue) and two railway tracks, with traffic maximum theoretical capacity of 4,500 vehicles / h per direction of travel and over 200 trains / day.
The bridge is entirely constructed in steel, with an overall width
of 60 m.