Preliminaryand final construction design, works supervision.
The project includes 2 rockfill breakwaters (4,100 m), access channel and navigable canal, turning basin (diameter 500 m), quays (1,500 m) and services infrastructures.
Preliminaryand final construction design, works supervision.
The project includes 2 rockfill breakwaters (4,100 m), access channel and navigable canal, turning basin (diameter 500 m), quays (1,500 m) and services infrastructures.